Bridge Structure Arrangement Service
DongBaek(GunJand) Bridge(Approach B) PSC BOX (MSS) 50 + 17@60 + 50 -Geometry control
Yeo Soo Industrial Complex Lot No.4 MSS L=1.05km, Ç¥ÁØ°æ°£ 60m detail design, construction equipment
In Cheon Bridge Lot No.5 FCM 50m + 80m + 50m + 3@50m tender design
Dae Ho Bridge FCM 70m + 120m + 70m detail design
Beol Gyo Bridge FCM 75m + 135m + 75m detail design
Buk Sil Bridge FCM 80m + 2@150m + 80m detail design
Seok San Bridge FCM 85m + 3@155 + 170 + 155 + 100m detail design
Taiwan High-speed Railway Bridge FCM ÁÖ°æ°£ 62m geometry control, construction engineering
Southern Short cut FCM ÁÖ°æ°£ 180m basic design
In Cheon Bridge FCM ÁÖ°æ°£ 145m construction engineering, geometry control
In Cheon Bridge Lot No.3 FSM, FCM L=2.18km, Ç¥ÁØ°æ°£ 60m basic design, detail design
Woon Ahm Bridge Extra dosed bridges 75m + 4@130m + 75m tender design
Moo Yeong Bridge Extra dosed bridges 100m + 4@165m + 100m alternative design, construction engineering
In Je 38 Bridge Extra dosed bridges ÁÖ°æ°£ 140m geometry control, construction engineering
UiJeongbu Light Rail Transit PSM ÁÖ°æ°£ 40m geometry control